Some progress was made - the doors and windows all need a rebate cutting into them so that eventually the shutters can fit back flush into the window. This required precision cutting with a stone saw and as it turned out an incredible amount of dust!
The wall behind the fireplace was raised and the peaks of blockwork raised ready to take the first of the roof timbers.
The roof timbers arrived in the middle of a torrent on Thursday.
No comments:
Post a Comment