Sunday 7 March 2010

More oak is moved into the house - Feb 2010

Two lots of oak have been taken in during February, the green oak to start the construction of the mezzanine floor in the salon. Bob put all this up by himself with the use of a block and tackle and a lot of bumps to the head!

The old oak beams rescued from the barn have been cleaned up, sanded down and then brought back in and now fixed up (again one man with a block and tackle) into position as these will show below the ceiling height.