Sunday 7 March 2010

The sheds are growing - Dec 09/Jan 10

Over the winter work continues on the outdoor buildings. This did mean that the roof was put on with Bob on hands and knees having fallen and broken a rib in his back. The larger open space is to be an outdoor dining room with the far corner forming and outdoor kitchen. The two closed in rooms are going to be a store room for lawn mower etc. The end room with the window and view down the valley is going to be the office.












No comments:

Post a Comment